{"id":4412,"date":"2017-10-18T15:00:57","date_gmt":"2017-10-18T15:00:57","guid":{"rendered":"https:\/\/briviagroup.ca\/yul-condominiums-starts-construction-on-its-2nd-tower\/"},"modified":"2019-10-23T15:47:26","modified_gmt":"2019-10-23T15:47:26","slug":"yul-condominiums-starts-construction-on-its-2nd-tower","status":"publish","type":"post","link":"https:\/\/briviagroup.ca\/zh-hans\/yul-condominiums-starts-construction-on-its-2nd-tower\/","title":{"rendered":"YUL CONDOMINIUMS STARTS CONSTRUCTION ON ITS 2ND TOWER"},"content":{"rendered":"<p><strong>MONTR\u00c9AL, October 18, 2017<\/strong> \u2013 \u00a0<a href=\"https:\/\/www.yulcentreville.com\/home\"><strong>YUL Condominiums<\/strong><\/a>, one of the largest residential projects in downtown Montr\u00e9al, today held an official ceremony marking the start of construction work on its second 38-storey tower. Located at 1400 Ren\u00e9-L\u00e9vesque Boulevard West, this second tower will be an integral part of the project being co-developed by the<a href=\"https:\/\/briviagroup.ca\/en\/\"><strong> Brivia Group<\/strong><\/a> and the<a href=\"http:\/\/groupedura.com\/\"> <strong>Tianco Group<\/strong><\/a>.<\/p>\n<p>\u201cThe construction of our second tower is a major milestone in our project and we are proud that coincides with the festivities marking the 375<sup>th<\/sup> anniversary of Montr\u00e9al,\u201d said <a href=\"http:\/\/www.khengly.ca\/\"><strong>Kheng Ly<\/strong><\/a>, President and CEO of <strong>Brivia Group<\/strong> and <strong>YUL Condominiums<\/strong>. \u201cWhile changing the face of downtown, its construction will help revitalize the neighbourhood and position <strong>YUL<\/strong> as one of the most prestigious addresses in Montr\u00e9al.\u201d<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter wp-image-3645 size-full\" src=\"https:\/\/briviagroup.ca\/wp-content\/uploads\/2018\/04\/yul2-1.png?_t=1523559412\" alt=\"\" width=\"1200\" height=\"675\" srcset=\"https:\/\/briviagroup.ca\/wp-content\/uploads\/2018\/04\/yul2-1.png 1200w, https:\/\/briviagroup.ca\/wp-content\/uploads\/2018\/04\/yul2-1-300x169.png 300w, https:\/\/briviagroup.ca\/wp-content\/uploads\/2018\/04\/yul2-1-768x432.png 768w, https:\/\/briviagroup.ca\/wp-content\/uploads\/2018\/04\/yul2-1-1024x576.png 1024w\" sizes=\"auto, (max-width: 1200px) 100vw, 1200px\" \/><\/p>\n<p>\u201cWe are very proud to have been able to start construction of the second tower of <strong>YUL Condominiums<\/strong> so quickly,\u201d added <strong>Steve Di Fruscia<\/strong>, CEO of the <strong>Tianco Group<\/strong>. \u201cThis is an important project for the international expansion of our parent company,<a href=\"http:\/\/en.tqgroup.net\/BUSINESS\/\"> <strong>Gansu Tianqing Real Estate Group<\/strong><\/a>, founded by its visionary Chairman Mr. <strong>Qing Han<\/strong>.\u201d<\/p>\n<p>The second tower will feature a large two-storey, fully-glazed entrance hall and a lounge and terrace on the 6th floor overlooking a 23,000-square-foot private garden. It also has multi-purpose rooms for events and a fitness room. Like the first tower, all common areas will be furnished by<a href=\"https:\/\/www.armani.com\/Casa\"> <strong>Armani\/Casa<\/strong><\/a>. Residents of Tower 2 will have access to all the amenities of Tower 1 (spa, indoor pool, garden, Sky Lounge and fitness room). The second tower will welcome its first residents starting in 2020.<\/p>\n<p><strong>YUL 2<\/strong> has been attracting buyers\u2019 attention since marketing began in March 2017. According to a report published by the<a href=\"https:\/\/www.altusgroup.com\/\"><strong> Altus Group<\/strong> <\/a>in June, <strong>YUL 2<\/strong> ranked first among the best sellers in Montr\u00e9al in the first quarter of the year.<\/p>\n<p>The <strong>YUL<\/strong> project includes two 38-storey residential towers and 17 townhouses. The two towers have more than 800 units including studios, 3 \u00bd, 4 \u00bd, 5\u00bd, and penthouses. Occupants of Tower 1 have been gradually taking possession of their units since September.<\/p>\n<p>The architecture firm <a href=\"http:\/\/www.msdl.ca\/en\/\"><strong>Menk\u00e8s Shooner Dagenais LeTourneux<\/strong><\/a>, in collaboration with <strong>Stefano Domenici <\/strong>Architect, has developed a unique structural concept for<strong> YUL<\/strong> which significantly sets it apart from numerous other projects. <strong>YUL Condominiums<\/strong> is also proud to join forces with <a href=\"http:\/\/www.magil.com\/\"><strong>Magil Construction<\/strong><\/a> for the actual construction.<\/p>\n<p>For more information, visit <a href=\"http:\/\/www.yulcentreville.com\/accueil\">yulcentreville.com<\/a> or the sales office located at 1400 Ren\u00e9-L\u00e9vesque Boulevard West, near Mackay St.<\/p>\n<p>Facebook : <a href=\"https:\/\/www.facebook.com\/YULCentreville\/\">https:\/\/www.facebook.com\/YULCentreville\/<br \/>\n<\/a>Instagram : <a href=\"https:\/\/www.instagram.com\/yulcentreville\/\">https:\/\/www.instagram.com\/yulcentreville\/<br \/>\n<\/a>Twitter : <a href=\"https:\/\/twitter.com\/YULcentreville\">https:\/\/twitter.com\/YULcentreville<\/a><\/p>\n<p><strong>About YUL Condominiums<br \/>\n<\/strong>A large-scale architectural project co-developed by the <strong>Brivia Group<\/strong> and the <strong>Tianco Group<\/strong>, <strong>YUL Condominiums Inc.<\/strong> comprises condominiums and townhouses. Located in downtown Montr\u00e9al, it includes two 38-story towers built in \u201cshifted blocks\u201d with more than 800 units and 17 townhouses.<\/p>\n","protected":false},"excerpt":{"rendered":"MONTR\u00c9AL, October 18, 2017 \u2013  YUL Condominiums, one of the largest residential projects in downtown Montr\u00e9al, today held an official ceremony marking the start of construction work on its second 38-storey tower. Located at 1400 Ren\u00e9-L\u00e9vesque Boulevard West, this second tower will be an integral part of the project being co-developed by the Brivia Group and the Tianco Group.\r\n","protected":false},"author":4,"featured_media":4413,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[172,1],"tags":[156,160,161,162,149,147,163,164,165,166,155,167],"class_list":["post-4412","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news-zh-hans","category-uncategorized-zh","tag-brivia-group-zh-hans","tag-brivia-new-project-zh-hans","tag-downtown-montreal-zh-hans","tag-groundbreaking-zh-hans","tag-groupe-brivia-en-zh-hans","tag-kheng-ly-zh-hans","tag-montreal-new-project-zh-hans","tag-msdl-zh-hans","tag-stefano-domenici-architect-zh-hans","tag-tianco-group-zh-hans","tag-yul-condominiums-en-zh-hans","tag-yul-phase-2-zh-hans"],"acf":[],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/briviagroup.ca\/zh-hans\/wp-json\/wp\/v2\/posts\/4412","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/briviagroup.ca\/zh-hans\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/briviagroup.ca\/zh-hans\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/briviagroup.ca\/zh-hans\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/briviagroup.ca\/zh-hans\/wp-json\/wp\/v2\/comments?post=4412"}],"version-history":[{"count":3,"href":"https:\/\/briviagroup.ca\/zh-hans\/wp-json\/wp\/v2\/posts\/4412\/revisions"}],"predecessor-version":[{"id":5618,"href":"https:\/\/briviagroup.ca\/zh-hans\/wp-json\/wp\/v2\/posts\/4412\/revisions\/5618"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/briviagroup.ca\/zh-hans\/wp-json\/wp\/v2\/media\/4413"}],"wp:attachment":[{"href":"https:\/\/briviagroup.ca\/zh-hans\/wp-json\/wp\/v2\/media?parent=4412"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/briviagroup.ca\/zh-hans\/wp-json\/wp\/v2\/categories?post=4412"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/briviagroup.ca\/zh-hans\/wp-json\/wp\/v2\/tags?post=4412"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}